Projects for Trello

Centralize all your Trello work in one place with Gantt charts, live reports, card syncing, and Board Groups.

Trello experts since 2014 15-day free trial Over 50.000 installs
The Projects Power-Up icon: a white ring around a tilted flag shape with a play triangle cut out, on a purple-to-pink gradient square.

What is Projects (by Placker)?

Projects by Placker connects all your Trello work in one place. Get Gantt charts, live reports, card syncing, and Board Groups. Track time spent on cards automatically.

✨ Key Features

  • Visualize project timelines with Gantt charts
  • Get live reports and track team progress
  • Sync cards automatically across multiple boards
  • Combine boards into unified views
  • Manage team workload and capacity
  • Track multiple projects from one dashboard

👥 Perfect For

  • Project managers tracking multiple project deadlines
  • Agile teams managing sprints and team capacity
  • Event planners coordinating timelines and team members
  • Team leaders keeping everyone aligned with dashboards
  • Portfolio managers overseeing multiple projects
  • Teams working across departments together

Start with a 15-day free trial. Get started in minutes. No credit card required.

Trusted by teams worldwide

See what our customers have to say

"This might be the best project management program I've ever used. Good job!"

Hugo
Brazil

"You can see multiple boards at a higher level by installing the Placker Power-Up in Trello in a concise and user-friendly view."

Scott
Canada

"You have a fantastic, polished product - very well designed UI and great functionality. Placker is my go-to portal for all of my work. Keep up the amazing work!"

Bart
Australia

"If you want to sync cards between different boards or create sub-tasks, I am recommending Placker on almost a daily basis."

Scott
Canada

"Thank you for this amazing tool, it has already improved the way we track and execute big complex projects."

Arno
South Africa

"The Gantt chart functionality is fantastic! It makes project tracking so much easier."

Karla
United States

"Fast, reliable, and impressively comprehensive. The configuration options exceeded my expectations."

Diego
Spain

"I am soo happy to have found Placker. Amazing and JUST what I need as a manufacturing company! All these others seem to cater for agencies and don't get it!!"

Laura
United Kingdom

"It was the best solution I could find for us to be able to measure if cards were completed on time. The dashboards are great."

Promise
United States

"I use trello extensively and have been waiting for ages for a gantt plugin to work. Tried two other ones, but they were very buggy and messy. Placker is intuitive and I have yet to experience any bugs in my trello+placker workflow. Love it! Actually I'm so excited I've been telling a bunch of friends and colleagues about it since I tried it out. I just LOVE Placker already, and have organized our planning in it. Will definitely be a long term user."

Mathias
Sweden

"We are very pleased with Placker. It is helping us to organize our projects in a collaborative and agile way!"

Fabricio
Brazil

"This is the kind of tool that makes life easier for a project manager."

Daniel
United Kingdom

"Wow. What a great combination Trello and Placker. I have tried all manner of Trello Gantt Power-Ups and extensions. None are in the same galaxy as Placker. Please keep up the great work."

Bradley
United States

"For me everything is working perfectly, the app is very good and is being useful in many projects."

Kryslan
Brazil

"I am loving Placker. First of all, i can use it online, without needing to install anything. Secondly, i use a lot Trello for engineering projects, so they synergize perfectly. Congratulations to you all."

Alexandre
Brazil

"I love how I can visually see all the tasks that need to be done and the ease that I can just drag and drop these project checkpoints into new positions and easily make achievable deadlines for myself, also LOVING the time commitment tracker at the bottom, to give a more realistic picture about how much work can be done during the work day."

David
United States

"I am so happy with the Power-Up. Thank you."

Richard
United States

"The Gantt chart offered a comprehensive birds-eye view of my project, enabling me to streamline the planning process. Its numerous functionalities ensured that I could easily organize and monitor the various stages of my research."

Conrado
Brazil

"Your product is pretty awesome. It's a huge step in the right direction to allow us to keep using Trello, but also to get a Gantt chart."

Shaun
United States

Live Updates

Real-Time Project Visibility

Dashboards and timelines refresh automatically as work happens. Always see current status without manual updates.

Auto-Syncing Dashboards
Dashboard widgets refresh automatically as board data changes.
Live Timeline Updates
Timelines adjust automatically when dates are changed on cards.
Instant Progress Tracking
Monitor status changes immediately as they happen without manual refreshing.
A Create Dynamic Reports graphic with a donut chart, a legend, and three report rows showing a card, its board, a Completed, In progress or Blocked status and member avatars.

Cross-Board Sync

Unified Workspace

Connect all your Trello boards. View, sync, and manage everything from one place while teams work their own way.

Connect unlimited boards into one system
Scale your operations by linking as many boards as needed into a single, cohesive ecosystem.
Centralize control without disrupting teams
Gain management oversight and control while allowing teams to execute work in their own space.
Sync and manage from a single view
Control synchronization rules and manage cross-board tasks from one central interface.
A Placker Gantt panel for Board A with two Card name bars joined by a dependency arrow, above a Resource management panel showing Jane Doe and John Doe with green and red daily hour cells.

Complete Toolkit

All-in-One Project System

The essential toolkit you need in one Power-Up: Gantt charts, live reports, card syncing, and board organization. No juggling multiple tools.

See everything updates automatically
Live dashboards, Gantt timelines, and reports update in real-time as your team works. No manual refresh needed.
One Power-Up replaces four separate tools
Get Gantt charts, live reports, card syncing, and Board Groups in a single Power-Up. Simpler setup, one subscription.
Work stays synchronized across all boards
Changes made anywhere instantly reflect everywhere. Perfect alignment without manual updates or board switching.
A Projects by Placker graphic with three tilted cards labelled Card mirroring, Custom dashboards and Gantt charts above the words And much more.

Ready to supercharge your Trello boards?

Start your 15-day free trial today. No credit card required.

Cookie Consent

We use cookies to enhance your browsing experience, serve personalized content, and analyze our traffic. By clicking 'Accept', you consent to our use of cookies.